Home / Resources / Installation Process
Installation Process
Our panels are easy to unload by hand and are well protected in transit. All this helps ensure that a perfect walk-in unit and refrigeration system will arrive undamaged and ready for a hassle-free installation. All of our packaging materials are recyclable and easy to dispose of.
A Look Inside the Cooler

Assembling the Freezer

Assembling the Freezer 2

Beginning the Door Frame

Building the Electrical Box

Crafting Insulation

Designing

Fastening the Insulation

In the Factory 2

Inside the Refrigerator

Installing the Door

Insulation 5

Laying the Seal

Marking It

Preparing for Delivery

Processing Sheet Metal

Start to Finish Installation Process

















